Project: BuckRV-8   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Buck Wyndham   -  
Project:   Vans - RV-8   -   VIEW REPORTS
Total Hours:3914.15
Start/Last Date:Jan 08, 2002 - No Finish Date
Engine:AeroSport Power IO-375-M1S
Propeller:Whirlwind 330-3B/72H-73 3-blade CS
Panel:G3X, G5, GTN650, GTR20, GTX45R, GMA245, GMC507
 
Friendly URL: https://eaabuilderslog.org?s=BuckRV-8

Home or Last Project Picture

May 04, 2007     Floorboard nutplates and gear towers - (2.8 hours)       Category: Fuselage
This evening I finished the access hole in the left gear tower by filing/sanding it to size. Next up will be drilling the holes out to full size for the screws, and installing the nutplates. (Tomorrow, maybe.)

Speaking of nutplates, I installed about 40 of them in the floor support angles. Only about 75 to go! There were several places where I used one-lug nuts because of the underlying structure, and a couple of other places where I'm still scratching my head about how I'll make it all work, but overall, I'm pleased with this whole floorboard project. I figure it'll take me about 30-35 hours of total effort to split the floorboards into multiple pieces and attach them entirely with screws and nutplates. Not a bad tradeoff for the great utility I'll get out of it.


 